Illustrative business case · 03
Design how the process should work.
We start from the prioritized opportunity and design a simpler, traceable, and more consistent future process. Only then do we evaluate the technology capabilities needed to enable it.
TO-BE
Future-process principles
The design responds directly to the friction observed in the AS-IS.
One entry point
Centralize the minimum information required to start each quotation.
Available information
Provide reliable access to current products, prices, and terms.
Clear validations
Define rules and owners for each exception.
Less rework
Validate data before generating the document.
End-to-end traceability
Know the status, owner, and next action.
Measurable follow-up
Capture process times and outcomes.
TO-BE
How the quotation should work
TO-BE map of the proposed process, directly comparable with the Step 01 AS-IS. Rules handle the standard flow while people intervene where judgment adds value.
- CustomerSubmits a structured requestStructured→
- SalesVerifies requirementsControl→
- Digital processValidates required dataRule→
- Digital processConsults product, price, and termsCentralized→
- OperationsValidates availability by exceptionException→
- Digital processConsolidates and generates draftAutomatic→
- ManagementApproves special termsException→
- SalesReviews proposalControl→
- SalesSends and follows upTraceable→
- Digital processRecords status and timingAutomatic→
- CustomerReceives quotation and statusTraceable
AS-IS → TO-BE
Target time and potential capacity
TO-BE design estimate used to guide the business case. These values must be validated during the pilot and confirmed in Step 05.
Internal work per quotation
Estimated impact27 potential minutes per quotation
Manual activities and rework
Estimated impact85 h/month of potentially released capacity
Customer response time
Estimated impact4.5-hour target reduction
Potentially released capacity does not automatically equal financial savings. Value depends on how the organization reallocates that time and on results verified after implementation.
From required capabilities to solution decision
We evaluate alternatives by their ability to support the process, not by the technology itself.
Initial scope
Included
- ✓ Structured intake
- ✓ Commercial information lookup
- ✓ Availability validation
- ✓ Rules and approvals
- ✓ Document generation
- ✓ Recording and follow-up
Outside the first scope
- — Contract negotiation
- — Billing and collections
- — Dispatch and logistics
- — Full replacement of corporate systems
Step 03
We now know how it should work.
- ✓ TO-BE designed
- ✓ Rules and responsibilities defined
- ✓ Required capabilities identified
- ✓ Initial scope agreed
The next step is to turn the design into an operating capability, test it, and support adoption.